Roads & Infrastructure in Bani-Hajer (North), Phase 1&2 Package 02


Owner/Client:
Public works authority- Ashghal.

Consultant: Parsons & Brinckerhoff/ Hyder

Main Contractor: HBK Contracting Company

Description: 7137 M of sewer and storm water line with various sizes (400,500,600 and 1500 mm)



Roads & Infrastructure in Rawdat Abal Heeran MMUP PH2 PKG 8

Owner/Client: Ashghal/ Drainage networks projects dept.

Consultant: Parsons & Brinckerhoff/ Atkins

Main Contractor: QBS International

Description: 13,654 M of sewer and storm water line with various sizes (500,600 and 800 mm)

Water transmission sceme from SAS Al-Nakheel to Saadiyat Island

HDD works for 1,200 mm twin water lines client: ADWEA

Consultant:Tebodin

Contractor: Lindenberg Emirates

Total length: 10,200 LM of 1,200 MM water lines and 150 MM hope pipe

No.of drives: 5 nos.

Method: HDD & microtunneling 650 LM of 2,400 MM water line in 1 drive (microtunneling)

Roads & infrastructure in Rawdat Abal Heeran

Owner / Client: Ashgal /  Drainage  Networks  Projects Dept

Consultant: Parsons & Brinckerhoff  / Atkins

Main Contractor: QBS International

Description: 13,654 M of sewer and storm water line with various sizes ( 500 MM, 600 MM & 800 MM)

Muharrk sewerage treatment plan & sewer conveyance - Kingdom of Bahrain

Client: Ministry of Works - Bahrain
Consultant: Hyder Contractor: Samsung Engineering
Total length: 10,600 LM of 1,100 LM of 1, ooo MM pipe dia and  5,500 lm of 1, 400 MM  pipe including 5 curve drives min of 400 LM & max of 650 LM of 1,800 MM pipes including 1 drive with horizontal & vertical curves. (Total number of drive 1,100 LM)
Method: Microtunneling