

Roads & Infrastructure in Bani-Hajer (North), Phase 1&2 Package 02
Owner/Client: Public works authority- Ashghal.
Consultant: Parsons & Brinckerhoff/ Hyder
Main Contractor: HBK Contracting Company
Description: 7137 M of sewer and storm water line with various sizes (400,500,600 and 1500 mm)

Roads & Infrastructure in Rawdat Abal Heeran MMUP PH2 PKG 8
Owner/Client: Ashghal/ Drainage networks projects dept.
Consultant: Parsons & Brinckerhoff/ Atkins
Main Contractor: QBS International
Description: 13,654 M of sewer and storm water line with various sizes (500,600 and 800 mm)


Water transmission sceme from SAS Al-Nakheel to Saadiyat Island
HDD works for 1,200 mm twin water lines client: ADWEA
Consultant:Tebodin
Contractor: Lindenberg Emirates
Total length: 10,200 LM of 1,200 MM water lines and 150 MM hope pipe
No.of drives: 5 nos.
Method: HDD & microtunneling 650 LM of 2,400 MM water line in 1 drive (microtunneling)

Roads & infrastructure in Rawdat Abal Heeran
Owner / Client: Ashgal / Drainage Networks Projects Dept
Consultant: Parsons & Brinckerhoff / Atkins
Main Contractor: QBS International
Description: 13,654 M of sewer and storm water line with various sizes ( 500 MM, 600 MM & 800 MM)

Muharrk sewerage treatment plan & sewer conveyance - Kingdom of Bahrain
Client: Ministry of Works - Bahrain
Consultant: Hyder Contractor: Samsung Engineering
Total length: 10,600 LM of 1,100 LM of 1, ooo MM pipe dia and 5,500 lm of 1, 400 MM pipe including 5 curve drives min of 400 LM & max of 650 LM of 1,800 MM pipes including 1 drive with horizontal & vertical curves. (Total number of drive 1,100 LM)
Method: Microtunneling
